Receive the installation order and designate the installation engineer to follow the order
1. Installation method
2. Installation environment:
3. Actual installation location
4. Confirm installation time
5. Site photos, drawings, renderings, etc. Wall bearing information, etc.
Design and install drawings, confirm with users, design wiring diagrams, and provide wire specifications and lengths. Design drawings of embedded parts and load-bearing parts, so that customers can construct and install in advance
Complete the installation and commissioning within the specified time limit
Prepare training materials and train relevant personnel
Prepare the acceptance report and final acceptance: After the system construction and debugging are completed, the system acceptance is carried out. For system functions, effects, etc. Overall function test:
1. The installation is required to be level and flat, and the connection with the ground is firm;
2. Display performance test;
3. System function test